Rabu, 18 Agustus 2010

PROJECT MANAGER - POWER PLANT

PROJECT MANAGER - POWER PLANT
Basic requirements & experience: ∙
He should have a strong technical background in Coal Fired Power Plant of size around 50-100 MW;∙

He should also understand the Indonesia’s basic Transmission Standard especially in the Bali-Jawa Grid;∙
Experience in managing sizeable Coal fired Plant in Indonesia is an advantage;∙

Experience in the stage of Pre-feasibility of Project that include Coal specification, available technology in the Fluidized Bed Boiler.∙

Having experience to setting up Financial Model / Analysis for a new Coal Fired Power Plant;∙

Having experience in prepared preliminary document for the EPC contracts and sourcing of the EPC contractors;∙

Fair knowledge in the IPP regulations in Indonesia;

Project schedule: immediate for duration of at least 1 year. The office will be in Citeureup and will be provided with other resources from Indonesia. He may have to travel occasionally to Cirebon site as the project sites will be located in 2 separate locations, i.e. Citeureup & Cirebon.

Perhaps your colleagues might be interested in exploring and they may send their CV to liani.kamil@asiaselect.co.id

Tidak ada komentar: